All Sections from Gaehwa to Veterans Hospital Station

A signal malfunction occurred on Seoul Subway Line 9, causing all express trains to be suspended and only regular trains to operate.


View of a section of the Seoul subway platform. Photo by Hyunmin Kim

View of a section of the Seoul subway platform. Photo by Hyunmin Kim

View original image

According to Seoul Metro Line 9 on March 17, a signal equipment failure occurred at the Integrated Control Center at 10:22 a.m. on March 17. As a result, all express trains between Gaehwa Station and Veterans Hospital Station are currently running as regular trains.


The signal malfunction was restored at 11:17 a.m., but express train service has not yet resumed. Currently, regular trains are operating normally.



A Seoul Metro Line 9 official stated, "Express trains will be gradually put back into service after safety is ensured."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing