[Photo] Kim Han-young, Chairman of Korea Rail Network Authority, Conducts On-site Inspection of GTX-A View original image


[Asia Economy (Daejeon) Reporter Jeong Il-woong] The Korea Rail Network Authority announced on the 29th that Chairman Kim Han-young visited the tunnel construction site of the entry and exit track at the Unjeong Station and vehicle depot of the Metropolitan Area Express Railway (GTX) Line A to check the progress of the project. The GTX Line A private investment project section (Paju to Samsung) is a double-track electric railway construction project with a total length of 42.6 km connecting Paju City, Goyang City, and Seoul. Chairman Kim (second from the right) is discussing the progress of the project with the GTX Line A site officials. Provided by Korea Rail Network Authority



This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing