'Road Flooding' Full Closure of Seobuganseon Underground Road for 5 Hours from 9 PM
Traffic Resumption at 2 AM on December 1
[Asia Economy Reporter Minji Lee] The Seoul Metropolitan Government announced on the 30th that it will fully close both directions of the Seobu Expressway Underground Road from 9 PM due to repair work following a failure in the drainage facility.
According to the city, a failure in the drainage pump within the Seobu Expressway Underground Road caused water to overflow on a section of the road (approximately 150 meters near Sinjeonggyo Bridge), resulting in the closure of traffic heading toward Iljik from 7:20 AM.
Hot Picks Today
As Samsung Falters, Chinese DRAM Surges: CXMT Returns to Profit in Just One Year
- "Most Americans Didn't Want This"... Americans Lose 60 Trillion Won to Soaring Fuel Costs
- Man in His 30s Dies After Assaulting Father and Falling from Yongin Apartment
- Samsung Union Member Sparks Controversy With Telegram Post: "Let's Push KOSPI Down to 5,000"
- "Why Make Things Like This?" Foreign Media Highlights Bizarre Phenomenon Spreading in Korea
The city decided to fully close the opposite direction toward Seongsan as well for repairs, and plans to resume traffic after 2 AM on December 1.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.