The access road to the Cheongna Incheon High-tech Park (IHP), which connects Jungbong-daero and Bongsu-daero in Incheon, is scheduled to open at 9 a.m. on April 20.


Construction on this road began at the end of 2020. The project cost a total of KRW 40.5 billion, and the road stretches 970 meters with six lanes for two-way traffic. Sidewalks and bicycle lanes were also installed.


Incheon Cheongna IHP Access Road. Provided by Incheon City

Incheon Cheongna IHP Access Road. Provided by Incheon City

View original image

The city expects that the opening of the road will improve traffic accessibility within the Cheongna Incheon High-tech Park and alleviate chronic congestion during commuting hours. In addition, connectivity with nearby industrial complexes around Incheon North Port will be enhanced, reducing the travel distance for logistics vehicles and generating cost savings.



An official from Incheon City stated, "With the opening of the Cheongna IHP access road, accessibility to nearby small-scale industrial complexes will be improved, increasing the overall efficiency of the regional transportation system," adding, "We will do our utmost to create a safe and pleasant road environment."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing