Samkang M&T to Construct Ulsan-class Batch-III Follow-up Ship Worth 335.3 Billion KRW
[Asia Economy Reporter Ji Yeon-jin] Samkang M&T announced on the 3rd that it has signed a contract with the Defense Acquisition Program Administration to build the Ulsan-class Batch-Ⅲ follow-up ship (second ship) worth 335.3 billion KRW.
Hot Picks Today
No Bacteria Detected in Arisu After 24 Hours of Repeated Drinking from a Tumbler
- [U.S.-China Summit] "If Taiwan Is Mishandled, Collision May Occur"... Xi Jinping Delivers Stern Warning to Trump
- "We Can't Just Let Them Be Damaged Inside"... Samsung Electronics Removes 360,000 Wafers in Preparation for Strike
- Wife in $6.7 Million Debt Took Out $3 Million in Husband's Life Insurance, Poisoned Him... US Court: "She Can Never Be Released"
- "He's Handsome, It's Such a Pity?"... Lawyer Responds to Bizarre 'Appearance Evaluation' of High School Girl Murder Suspect
This content was produced with the assistance of AI translation services.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.