Yangsan Mulgeum Brownstone, Model House Opens on the 10th View original image


[Asia Economy Reporter Yuri Kim] Isu Construction announced that it will open the model house for 'Yangsan Mulgeum Brownstone,' a redevelopment project of Beomeo Jugong 1 Complex in Yangsan-si, Gyeongnam, on the 10th. The model house will operate by appointment only to prevent the spread of COVID-19.


Yangsan Mulgeum Brownstone first unveiled a cyber model house on the 3rd to minimize the spread of COVID-19. The cyber model house allows visitors to view model rooms of each floor plan virtually through virtual reality (VR) videos, identical to the actual model house.


The complex consists of 6 buildings, ranging from 3 basement floors to a maximum of 29 floors above ground. It offers floor plans of 59 to 84㎡ (exclusive area) and a total of 842 households. Among them, 206 units are for general sale. A sales official stated, "Despite being a redevelopment apartment, the south-facing 4-bay floor plan design is expected to be highly preferred by actual buyers."


Yangsan is a city adjacent to Busan, with many residents commuting to workplaces in the Busan area. The complex is adjacent to the Mulgeum district, a representative residential center of Yangsan. It is also close to the planned Busan National University Yangsan Campus. Convenience facilities such as marts and CGV are located nearby, and Yangsan Busan National University Hospital is also adjacent.


Busan Subway Line 2's Namyangsan Station is also nearby. Beomeo Elementary School is located right in front of the complex, and Beomeo Middle School and Mulgeum High School are also close. Behind the complex is the Obongsan hiking trail, and nearby are Yangsan Design Park and Yangsan Water Park.


The complex places parking spaces underground, designing the aboveground area as pedestrian-centered landscaping with walking paths. A sales official said, "Interest has grown since the cyber model house opened last week, leading to the opening of the model house. We will ensure safe model house visits based on thorough quarantine measures and movement management to prevent the spread of COVID-19."



Yangsan Mulgeum Brownstone plans to start special supply on the 14th, first priority subscription on the 15th, and second priority subscription on the 16th. The announcement of winners is scheduled for the 22nd, and the official contract period is from August 3 to 5.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing