[Asia Economy Reporter Lim Chunhan] OrbiTech announced on the 9th that it has signed a service contract with Korea Hydro & Nuclear Power for the in-service inspection of the steam generator heat exchanger tubes at Wolseong Units 3 and 4.



This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing