Incheon City Comprehensive Construction Headquarters announced on the 8th that it will open a road connecting the Namcheongra Interchange (IC) on the Metropolitan Area 2nd Ring Expressway and the Bukhang Hinterland Complex on the 11th.


The Namcheongra IC to Bukhang connecting road began construction in August 2018 with an investment of 46 billion KRW. The total length is 1.5 km, including a 360 m bridge, with 4 to 6 lanes in both directions. Using this connecting road by vehicle allows direct access from the Bukhang Hinterland Complex to Namcheongra IC via Robot Land Road, reducing travel time by about 15 minutes.


The city expects that with the additional opening of the connecting road following the Cheongra to Bukhang Hinterland Complex connecting road opened on the 15th of last month, the logistics function of the Bukhang Hinterland Complex, which was previously cut off by an oil pipeline, will be further strengthened.


Heo Hong-gi, head of Incheon City Comprehensive Construction Headquarters, said, "The opening of this connecting road will provide transportation convenience to citizens and significantly reduce logistics costs, playing a major role in the development of the Cheongra and Bukhang areas."



Namcheongra IC to Bukhang Connecting Road [Provided by Incheon City]

Namcheongra IC to Bukhang Connecting Road [Provided by Incheon City]

View original image


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing