Gangwon Fire Headquarters Confirms 'New Office Site' in Wududong, Chuncheon
15,000㎡, 1 Basement Floor & 5 Above Ground Floors... Scheduled for Completion in 2025
[Asia Economy Reporter Ra Young-cheol] The Gangwon Provincial Fire Headquarters has confirmed the site of the Agricultural Technology Institute (Wudu-dong, Chuncheon City), which was relocated last October, as the planned location for the new headquarters building.
According to the Provincial Fire Headquarters on the 13th, the total project cost for constructing the new headquarters is 29.7 billion KRW. The site area is 15,000㎡, and the new building will be newly constructed with a total area of 6,350㎡, including a main building with one basement floor and five above-ground floors, as well as annex buildings.
In the first half of this year, preliminary procedures such as reporting the project plan to the provincial council will be completed, followed by the start of design work in the second half. Construction is scheduled to begin next year, aiming for completion in 2025.
Hot Picks Today
No Bacteria Detected in Arisu After 24 Hours of Repeated Drinking from a Tumbler
- "We Can't Just Let Them Be Damaged Inside"... Samsung Electronics Removes 360,000 Wafers in Preparation for Strike
- "Up to 100 Trillion Won in Losses Feared, It's Not About Second Place but Catastrophe"... Industry Minister: 'Emergency Mediation Unavoidable If Samsung Strike Occurs'
- Wife in $6.7 Million Debt Took Out $3 Million in Husband's Life Insurance, Poisoned Him... US Court: "She Can Never Be Released"
- "He's Handsome, It's Such a Pity?"... Lawyer Responds to Bizarre 'Appearance Evaluation' of High School Girl Murder Suspect
The new headquarters will feature a comprehensive situation room for the Provincial Fire Headquarters, including the 119 emergency rescue system, which will be fully renewed to establish a disaster reporting and response system equipped with advanced functions such as video and big data.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.