KAI Signs 800 Billion KRW Contract for 2nd Phase Development of Baekdu System Reconnaissance Aircraft
Expected Image of Mission Aircraft for the 2nd Phase of Baekdu System Capability Enhancement Project
View original image[Asia Economy Reporter Dongwoo Lee] Korea Aerospace Industries (KAI) announced on the 17th that it has signed a system development contract with the Defense Acquisition Program Administration for the ‘Baekdu System Capability Enhancement Phase 2 Project.’
This contract involves developing four new Baekdu reconnaissance aircraft domestically to replace the aging existing Baekdu reconnaissance aircraft by the end of 2026, with a project scale in the early 800 billion KRW range.
KAI, as the system development contractor, will be responsible for system integration of major avionics equipment such as information collection devices and transmission/reception systems based on France’s Dassault Business Jet Falcon 2000LXS, as well as developing ground systems and integrated system support elements for operating the information collection system.
Unlike the first Baekdu System Capability Enhancement project, which was led by the Agency for Defense Development from 2011 to 2018, KAI will take charge of comprehensive system development in this second phase, marking the entry of domestic defense industry’s reconnaissance aircraft development capabilities into a mature stage.
Starting with this project, KAI plans to actively participate in surveillance system construction projects such as long-range electronic warfare aircraft and Joint ISTAR (Intelligence, Surveillance, Target Acquisition, and Reconnaissance) aircraft, which are scheduled to be promoted in accordance with the government’s policy to transfer wartime operational control.
By concurrently developing its proprietary model of medium transport aircraft, KAI aims to expand new growth engines through additional supply and maintenance, repair, and overhaul (MRO) of transport aircraft, maritime patrol aircraft, and various mission-specific aircraft.
Hot Picks Today
"Rather Than Endure a 1.5 Million KRW Stipend, I'd Rather Earn 500 Million in the U.S." Top Talent from SNU and KAIST Are Leaving [Scientists Are Disappearing] ①
- "Not Jealous of Winning the Lottery"... Entire Village Stunned as 200 Million Won Jackpot of Wild Ginseng Cluster Discovered at Jirisan
- "I'll Stop by Starbucks Tomorrow": People Power Chungbuk Committee and Geoje Mayoral Candidate Face Criticism for Alleged 5·18 Demeaning Remarks
- "Hancom Breaks Away from Its 36-Year Mission and Formula for Success" (Comprehensive)
- "How Did an Employee Who Loved Samsung End Up Like This?"... Past Video of Samsung Electronics Union Chairman Resurfaces
A KAI official stated, “The Baekdu System Capability Enhancement Phase 2 Project is a core project for the development of the domestic aerospace industry, including strengthening our military power, accumulating technology, and creating jobs. We will successfully carry out the project based on KAI’s diverse aircraft development experience.”
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.