Hoban Construction to Open 'Hoban Summit Siheung Geomo B1 Block' Model House on March 20
24 Floors Above Ground, 353 Units in Total
Special Supply Begins on March 23
Hoban Construction announced on March 17 that it will open the model house for 'Hoban Summit Siheung Geomo B1 Block,' which is being supplied to the Siheung Geomo District, on March 20, and will begin sales.
Hoban Summit Siheung Geomo B1 Block is a residential complex with 353 units, consisting of four buildings ranging from two basement levels to 24 floors above ground, all with a single exclusive area of 84 square meters. Of these, 43 units are public rental housing and the remaining 310 units will be available for general sale. By type, there are 233 units of 84㎡A and 77 units of 84㎡B.
Perspective view of Hoban Summit Siheung Geomo B1 Block. Provided by Hoban Construction
View original imageHoban Summit Siheung Geomo B1 Block is located in an area with educational, residential, and transportation infrastructure. Doil Elementary School, Gunja Middle School, and Gunja Digital Science High School are within walking distance, and residents will have convenient access to the Siheung City Gunja Library. Additionally, new elementary and middle schools are planned to be established approximately 400 meters from the complex.
The transportation environment is also expected to improve. To the south of the Geomo District are Singil Oncheon Station on Subway Line 4 and the Suin Bundang Line, providing quick access to Seoul and major locations in the metropolitan area via the Pyeongtaek-Siheung Expressway and Yeongdong Expressway. At Cho Station, which is two stops away from Singil Oncheon Station, the Incheon KTX line (scheduled to open in 2026) connecting to Songdo, and the Shin Ansan Line (scheduled to open in 2028) connecting to Yeouido, are planned.
The complex will feature community facilities such as a fitness center, golf driving range, kids cafe, and residents' meeting room. Advanced convenience services will also be provided, including a smart health management system to monitor physical condition via a resident-exclusive platform, as well as healthcare, edutech, and a robot cafe. The complex is designed primarily with south-facing units, wide spacing between buildings, and a plate-type layout to enhance natural lighting, ventilation, and a sense of openness. All units will have a four-bay, four-room floor plan.
Hot Picks Today
"Samsung Electronics Employee with 100 Million Won Salary Receiving 600 Million Won Bonus... Estimated Tax Revealed"
- Lived as Family for Over 30 Years... Daughter-in-Law Cast Aside After Husband's Death
- Lotte Pays Deposit First, Daewoo Responds: Seongsu District 4 Construction Rights Rematch [Real Estate AtoZ]
- Despite ‘Tank Day’ Controversy, Gwangju Schools Purchased Starbucks Gift Certificates
- "Wore It Once, Then This? White Spots All Over 4.15 Million Won Prada Jacket... 'Full Refund Ordered'"
The sales schedule begins with special supply on March 23, followed by first-priority applications on March 24 and second-priority applications on March 25. The lottery results will be announced on March 31, and contracts will be signed over a three-day period from April 13 to 15. Move-in is scheduled for November 2028.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.