Haengsin Elementary School, Ilsan Dongbu Police Station, and Ilsan Dong-gu Office Station Transformed with Precast Concrete Roads

Goyang Special City in Gyeonggi Province (Mayor Lee Dong-hwan) announced on the 8th that the central lane bus stop road improvement project has entered its final stage.

After the road improvement construction at the central lane bus stop. Provided by Goyang Special City

After the road improvement construction at the central lane bus stop. Provided by Goyang Special City

View original image

The project, which began in August, involves upgrading the existing asphalt concrete pavement to precast concrete pavement. Construction has been completed at 7 out of 8 locations, including Haengsin Elementary School, Ilsan Dongbu Police Station, Ilsan Dong-gu Office, and both directions of Madu Station bus stops. The remaining construction at Madu Station will take place from the 8th to the 10th.


This improvement project was promoted to enhance the durability of bus stop roads and reduce long-term maintenance costs.


In particular, precast concrete pavement is installed by assembling pre-manufactured concrete panels on site. It has higher strength than traditional asphalt pavement and better withstands climate changes and vehicle loads, thereby improving safety by controlling plastic deformation.


An official from the Goyang Special City Road Management Division stated, “Through this central lane road improvement project, we hope citizens can use public transportation facilities more safely and comfortably. We will also complete the remaining site without delay to contribute to the enhancement of transportation convenience.”



Meanwhile, the city plans to continue promoting road improvement and maintenance projects in the future to ensure citizens can use public transportation more safely and conveniently.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing