Anseong Woldongcheon

Anseong Woldongcheon

View original image

The Woldongcheon improvement project in Anseong, Gyeonggi Province has been completed.


Gyeonggi Province announced on the 22nd that the 'Woldongcheon Local Stream Improvement Project,' carried out in the area from Sangjung-ri, Geumgwang-myeon to Osan-ri, Geumgwang-myeon in Anseong City, was finished on the 15th.


Woldongcheon in Anseong City is a place where houses were flooded due to a levee collapse in 2006, leaving local residents with damage and anxiety during heavy rains.


The local stream improvement project is implemented for flood control purposes, targeting areas urgently needing flood damage prevention by raising levees or widening waterways.


Gyeonggi Province invested a total of 20 billion KRW in this Woldongcheon local stream improvement project, starting construction in December 2019, and maintained a 1.8 km section of the stream.


As a result of the improvement project, the width of the stream, which was originally 15 to 20 meters, was expanded to 25 to 40 meters, allowing the area to avoid flood damage even during localized heavy rains.



Jeong Seon-woo, Director of the Gyeonggi Province Construction Bureau, stated, "We will actively focus on maintaining areas expected to suffer flood damage from summer typhoons and heavy rains, and do our best to prevent significant damage caused by heavy rainfall."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing