Ulsan City announced that it will carry out the "Shindapgyo Bridge Deck Pavement Construction" from 9 PM on the 9th to 6 AM on the 10th.


This construction involves repaving the deteriorated bridge surface of Shindapgyo (Buk-gu Sangandong to Sincheon-dong, length 132m, 6 lanes two-way).


Although two-way vehicle traffic will be possible during the construction period, partial lane closures of 1 to 2 lanes in the construction section will be implemented.


Therefore, it is recommended to take detours via surrounding roads such as Sangangyo and Cheongok 2-gyo.


Ulsan City plans to minimize inconvenience to citizens by guiding vehicle traffic through construction notice signs, flashing warning lights, flashing display boards, and signal personnel deployment.



An official from Ulsan City stated, "We expect to enhance user satisfaction by not only resolving citizen inconvenience and preventing safety accidents but also providing a pleasant road environment," and asked for citizens' cooperation.

Ulsan City Hall.

Ulsan City Hall.

View original image


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing