Shin-Gori Unit 4 Resumes Power Generation After Equipment Inspection
[Asia Economy Yeongnam Reporting Headquarters Reporter Dongguk Lee] Korea Hydro & Nuclear Power Saewool Nuclear Power Headquarters announced, "Shin-Kori Unit 4 (Pressurized Water Reactor, 1.4 million kW) resumed power generation at 03:43 on the 27th and reached 100% output at 23:30."
Hot Picks Today
At President Lee's Call to "Give Enough to Shock," Whistleblower Rewards Become a Real Lottery
- If They Fail Next Year, Bonus Drops to 97 Million Won... A Closer Look at Samsung Electronics DS Division’s 600M vs 460M vs 160M Performance Bonuses
- Lived as Family for Over 30 Years... Daughter-in-Law Cast Aside After Husband's Death
- Opening a Bank Account in Korea Is Too Difficult..."Over 150,000 Won in Notarization Fees Just for a Child's Account and Debit Card" [Foreigner K-Finance Status]②
- "Who Is Visiting Japan These Days?" The Once-Crowded Tourist Spots Empty Out... What's Happening?
Shin-Kori Unit 4 experienced an automatic turbine shutdown due to temporary high turbine vibration during a turbine control valve test on the 26th, and equipment inspection confirmed no abnormalities.
This content was produced with the assistance of AI translation services.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.