[Asia Economy Reporter Lee Seon-ae] Doosan Heavy Industries & Construction announced on the 30th that it has signed a contract with Korea Gas Corporation for the construction of the first phase storage tank at the Dangjin base. The contract amount is 550.27082 billion KRW, which corresponds to 3.63% of the 2020 sales. The contract period is until December 31, 2025.



This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing