Perspective View of Paju Unjeong New Town Jeil Punggyeongchae 2nd Phase Grand Venue

Perspective View of Paju Unjeong New Town Jeil Punggyeongchae 2nd Phase Grand Venue

View original image


[Asia Economy Reporter Ryu Tae-min] Jeil Construction announced on the 24th that it will open the model house for ‘Paju Unjeong New Town Jeil Punggyeongchae 2nd Grand Venue’ on the 25th and officially begin the sales schedule.


Paju Unjeong New Town Jeil Punggyeongchae 2nd Grand Venue is located in Block A10 of Paju Unjeong New Town District 3, consisting of 660 households in total, with one basement floor and up to 23 floors above ground. The units are composed of exclusive areas of 59, 84, and 101㎡, with the number of units by type as follows: ▲59㎡ 172 units ▲84㎡ 318 units ▲104㎡ 170 units.


The complex offers convenient residential living by taking advantage of the abundant infrastructure in Paju Unjeong New Town. It is easy to access Jayuro, the 2nd Jayuro, and the Seoul-Munsan Expressway nearby, allowing quick travel to urban centers such as Gimpo, Goyang, and Seoul.


The transportation infrastructure project connecting Paju Unjeong New Town and Seoul is also being improved, increasing future value. Currently, Unjeong Station (tentative name), the starting point of the GTX (Great Train Express) Line A in the metropolitan area, is planned to be built in Unjeong New Town. GTX-A began construction in June 2019 and is progressing at the fastest pace among GTX lines. Once opened, it will take 20 minutes to Seoul Station and less than 30 minutes to Samsung Station.


In April, the ‘4th National Railroad Network Construction Plan’ also included the extension project of Line 3 (Ilsan Line) to Paju. The plan extends 10.7 km from Ilsan Daehwa to Geumneung Station, enabling direct travel from Paju to Gangnam without transfers upon completion.


Block A10 boasts one of the best school district locations within Paju Unjeong New Town. The complex will include a public daycare center (planned), and a kindergarten will be built right in front. Additionally, elementary, middle, and high schools are all planned within walking distance, providing a ‘one-stop school district’ with up to 17 years of worry-free education.


Proximity to workplaces is also high. To the west of Paju Unjeong New Town are Sinchon Industrial Complex, Munbal Industrial Complex, and Paju Publishing Complex. Within a 20-minute drive, residents can access Paju LCD General Industrial Complex, Tanhyeon National Industrial Complex, and Chukhyeon 1 and 2 Industrial Complexes, making commuting convenient. Furthermore, various advanced industrial complexes such as Paju Medical Cluster and Unjeong Techno Valley are progressing smoothly nearby.


This Paju Unjeong New Town Jeil Punggyeongchae 2nd Grand Venue is designed mainly with all units facing south in a slab-type layout, securing ample distance between buildings, and excellent sunlight and cross ventilation. All units include a dressing room, and some units also offer an alpha room and pantry, providing excellent space utilization. The ground level of the complex is car-free and designed as a park-type complex with ample walking paths and rest facilities, making it ideal for residents to enjoy leisure activities.


Subscription starts with special supply on July 6, followed by the first priority subscription on the 7th. Winners will be announced on the 14th, and the official contract period will continue from the 26th to the 30th. The average sale price is relatively affordable compared to the surrounding area as the price ceiling system is applied since it is built on public land.


A sales official said, “Paju Unjeong New Town Jeil Punggyeongchae 2nd Grand Venue is a school district complex with all educational institutions located nearby, and it has optimal apartment conditions for the 30s and 40s generation, including transportation and proximity to workplaces, which attracted much interest even before subscription. We will do our best to apply excellent products and designs worthy of the Jeil Punggyeongchae brand power so that residents can live with pride.”



Meanwhile, to prevent the spread of COVID-19 infection, the model house will operate by prior reservation. The expected move-in date is January 2024.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing