[Photo] Sinwol-Yeoui Underpass to Open Tomorrow
The 'Sinwol-Yeoui Underground Road' (formerly Seoul Jemulpo Tunnel), directly connecting Sinwol IC in Yangcheon-gu, Seoul, with Yeouido-daero and Olympic-daero in Yeongdeungpo-gu, will open at midnight on the 16th. It has been 5 years and 6 months since construction began in October 2015. Using the Sinwol-Yeoui Underground Road reduces the commute time from Sinwol IC to Yeouido during rush hours from the existing 32 minutes to 8 minutes, cutting 24 minutes. The toll fee is 2,400 won, and the speed limit is 80 km/h. The photo shows the interior of the Sinwol-Yeoui Underground Road on the 15th. / Reporter Kim Hyun-min kimhyun81@
Hot Picks Today
"Rather Than Endure a 1.5 Million KRW Stipend, I'd Rather Earn 500 Million in the U.S." Top Talent from SNU and KAIST Are Leaving [Scientists Are Disappearing] ①
- "Not Jealous of Winning the Lottery"... Entire Village Stunned as 200 Million Won Jackpot of Wild Ginseng Cluster Discovered at Jirisan
- "I'll Stop by Starbucks Tomorrow": People Power Chungbuk Committee and Geoje Mayoral Candidate Face Criticism for Alleged 5·18 Demeaning Remarks
- "Hancom Breaks Away from Its 36-Year Mission and Formula for Success" (Comprehensive)
- "How Did an Employee Who Loved Samsung End Up Like This?"... Past Video of Samsung Electronics Union Chairman Resurfaces
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.