'Hoban Summit Godeok New Town Phase 2' First Priority Subscription Closed... Highest Competition Rate 102 to 1
Aerial view of Hoban Summit Godeok New City Phase 2, Block A43, Godeok International New City, Pyeongtaek-si, Gyeonggi Province (Provided by Hoban Construction)
View original image[Asia Economy Reporter Lee Chun-hee] Hoban Construction's "Hoban Summit Godeok New City Phase 2," supplied in A43 block of Godeok International New City, Pyeongtaek-si, Gyeonggi-do, successfully closed first-priority subscription with an average competition rate of 40 to 1.
According to the Korea Real Estate Agency's "Subscription Home" on the 2nd, excluding special supply, a total of 9,895 people applied for the general supply of 264 households conducted the day before, recording an average competition rate of 40.2 to 1. This complex consists of 7 buildings from basement level 1 to ground level 35, with all 766 households composed only of 84㎡ (exclusive area) units.
By type, the 84㎡A had the highest competition rate. With 3,268 subscription accounts pouring in for 32 households, it showed a three-digit competition rate of 102.1 to 1. Next were ▲84㎡B at 41.8 to 1 ▲84㎡C at 33.5 to 1 ▲84㎡E at 31.9 to 1 ▲84㎡D at 31.1 to 1 ▲84㎡F at 20.4 to 1, in that order.
The biggest advantage of this complex is its excellent transportation conditions. A Bus Rapid Transit (BRT) stop that circulates Godeok International New City is scheduled to be installed near the complex, and Jije Station, where SRT and Seoul Metropolitan Subway Line 1 can be used, is accessible within 15 minutes by car.
Hoban Construction introduced a south-facing complex layout for this complex and applied a 4-bay design to most households to secure ventilation and views. Community facilities include a sunken plaza, fitness club, GX room, small library, and indoor golf practice range, providing various spaces to enjoy hobbies and leisure.
The winners will be announced on the 8th, and contracts will be conducted over three days from the 21st to the 23rd. Move-in is scheduled for May 2022.
Hot Picks Today
"Rather Than Endure a 1.5 Million KRW Stipend, I'd Rather Earn 500 Million in the U.S." Top Talent from SNU and KAIST Are Leaving [Scientists Are Disappearing] ①
- "Not Jealous of Winning the Lottery"... Entire Village Stunned as 200 Million Won Jackpot of Wild Ginseng Cluster Discovered at Jirisan
- "I'll Stop by Starbucks Tomorrow": People Power Chungbuk Committee and Geoje Mayoral Candidate Face Criticism for Alleged 5·18 Demeaning Remarks
- Woman Experiences Eye Protrusion After 20 Years of Contraceptive Injections, Plans Lawsuit Against Major Pharmaceutical Company
- "How Did an Employee Who Loved Samsung End Up Like This?"... Past Video of Samsung Electronics Union Chairman Resurfaces
A Hoban Construction sales official said, "The location is good even within Godeok International New City, and the previously supplied Hoban Summit Phase 1 also received good word of mouth," adding, "This complex also had many advantages such as excellent location, floor plans, and various storage spaces, resulting in good outcomes."
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.