GS Construction Wins 460.6 Billion KRW Contract for Samhwan Garak Reconstruction
GS Construction announced on the 17th that it has won the contract for the Samhwan Garak Apartment Housing Reconstruction Maintenance Project.
The contract amount is 460.562 billion KRW, which corresponds to 3.58% of the 2024 sales forecast. The contract period is 42 months from the actual start of construction.
Hot Picks Today
"Parents Deposited 10 Million Won for Me"... Se...
- Mayor Lee Kwonjae Runs for Re-election... "A Mayor for the Economy Who Gets Resu...
- "SK Hynix Stock Windfall"... Teenager With Wads of Cash Turns Thief at Jewelry S...
- "Major Crash Is Coming... Buy Even If You Have to Skip a Meal" 'Rich Dad' Shares...
- "Save 30 Million Won, Grow It to 100 Million": Dramatic Pledge Sparks "Is This a...
The Samhwan Garak Apartment reconstruction project involves constructing a complex of 1,077 residential units and auxiliary welfare facilities in 8 buildings ranging from 4 basement floors to 35 above-ground floors at 176 Garak-dong, Songpa-gu, Seoul.
This content was produced with the assistance of AI translation services.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.