Cheongsong-gun, Gyeongbuk Province (Governor Yoon Kyung-hee) announced that the construction suspension order issued on December 23rd last year to prevent deterioration of construction quality and poor workmanship due to subzero temperatures in winter will be lifted starting March 4th.


However, in preparation for temporary sharp drops in temperature, utmost effort will be made in site management, and thorough safety measures will be implemented around construction sites through pre-inspections during the thawing period to prevent accidents.


Additionally, before the farming season, agricultural infrastructure such as farm roads, drainage channels, and irrigation facilities will be completed, along with small-scale resident-requested projects, to ensure there are no inconveniences for residents.



A Cheongsong-gun official stated, “With the lifting of the winter construction suspension, we plan to fully ensure quality control and sound construction of projects, and actively incorporate excellent local manpower, materials, and equipment to revitalize the local construction economy facing difficulties.”

Cheongsong County Office.

Cheongsong County Office.

View original image


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing