Uijeongbu-si Launches 'Urban Emptying Project'
Integrated Maintenance of Excessive Signboards in Gosan District
Ensuring Driver Visibility to Prevent Safety Accidents
Uijeongbu City, Gyeonggi Province (Mayor Kim Dong-geun) announced on the 11th that it has carried out the "Urban Clearing Project" to integrate and organize excessively and unnecessarily installed signs on roads in the Gosan district.
The government is conducting an "Urban Clearing Project" to integrate and organize excessively and unnecessarily installed signs on roads in the Gosan district. Provided by Uijeongbu City
View original imageDuring road use, excessive and unnecessary signs such as pavement markings, traffic safety signs, and guide signs overlap, causing confusion in drivers' visibility and rather causing a counterproductive effect on safety.
Accordingly, the city conducted a full survey of poles with various signs in the Gosan district in cooperation with the Uijeongbu Police Station, and organized a total of 264 poles (67 protruding poles and 197 fixed poles).
Various signs installed separately on fixed and protruding poles were integrated with street facilities (streetlights, traffic signals, closed-circuit television (CCTV), etc.), and unnecessary poles were removed.
Specifically, out of 264 poles installed along the roadside, 239 were removed, and among 408 signs, 132 were removed and 251 were integrated to secure drivers' visibility, thereby creating a safe road environment.
Hot Picks Today
"Stocks Are Not Taxed, but Annual Crypto Gains Over 2.5 Million Won to Be Taxed Next Year... Investors Push Back"
- "Don't Throw Away Coffee Grounds" Transformed into 'High-Grade Fuel' in Just 90 Seconds [Reading Science]
- [Report] "I Think Twice Before Going to a Store"... Starbucks '5/18 Tank Day' Controversy Grows
- The Unexpected Story of an American Man Who Won the Lottery 18 Times in 29 Years: "My Real Luck Is My Wife"
- "Even With a 90 Million Won Salary and Bonuses, It Doesn’t Feel Like Much"... A Latecomer Rookie Who Beat 70 to 1 Odds [Scientists Are Disappearing] ③
Mayor Kim Dong-geun said, "We plan to establish an annual maintenance plan to integrate and organize various signs and street facilities," adding, "We will continue to maintain unnecessary and excessive facilities to make Uijeongbu City a place where people want to walk safely."
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.