Utilizing Existing Trails to Install Hwangto Paths, Hwangto Foot Baths, and Foot Washing Facilities
Enhancing Accessibility with Two Locations Installed at Upper and Lower Sections... Acupressure Walkways Constructed on Sloped Areas

Dongdaemun-gu (District Mayor Lee Pil-hyung) announced that it has created a forest loess trail in Dapsimni Neighborhood Park and held an opening ceremony on the 25th to meet the high interest of residents in barefoot walking exercises.


The 'Dapsimni Neighborhood Park Loess Trail' was designed considering the characteristic that the park is divided by a road in the center. A total of 240 meters of loess trail was created, with 130 meters in Dapsimni 1 Park (upper part) and 110 meters in Dapsimni 2 Park (lower part).


The loess trail is equipped with various convenience facilities such as a loess foot bath, foot washing station, shoe rack, bag hanger, and rest area to allow residents to use it more conveniently.

Creation of a Forest Red Clay Path in Dapsimni Neighborhood Park, Dongdaemun-gu View original image

It was planned to help improve residents' health through a barefoot walking path that is good for blood circulation and to provide a healing space where they can relax in nature.


The location of the loess trail was originally planned to be at the top of the park, but after collecting residents' opinions, the current location was decided to reflect the requests of local residents. Additionally, a acupressure walkway was constructed on the sloped sections to prevent loess erosion and ensure safety.



Lee Pil-hyung, Mayor of Dongdaemun-gu, said, “I hope residents take care of their health and enjoy relaxation on the Dapsimni Neighborhood Park Loess Trail,” and added, “We will continue to make efforts so that residents can enjoy a more comfortable and healthy life.”


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing