Shin Kori Unit 2, Steam System Equipment Failure... Turbine Manually Shut Down
Korea Hydro & Nuclear Power Kori Nuclear Power Headquarters (Director Lee Gwanghun) announced that at around 9:14 a.m. on the 10th, the turbine of Shin-Kori Unit 2 (pressurized water reactor type, 1 million kW class) was manually shut down due to a malfunction in the steam system equipment.
Hot Picks Today
"Rather Than Endure a 1.5 Million KRW Stipend, I'd Rather Earn 500 Million in the U.S." Top Talent from SNU and KAIST Are Leaving [Scientists Are Disappearing] ①
- "Not Jealous of Winning the Lottery"... Entire Village Stunned as 200 Million Won Jackpot of Wild Ginseng Cluster Discovered at Jirisan
- "I'll Stop by Starbucks Tomorrow": People Power Chungbuk Committee and Geoje Mayoral Candidate Face Criticism for Alleged 5·18 Demeaning Remarks
- Woman Experiences Eye Protrusion After 20 Years of Contraceptive Injections, Plans Lawsuit Against Major Pharmaceutical Company
- "How Did an Employee Who Loved Samsung End Up Like This?"... Past Video of Samsung Electronics Union Chairman Resurfaces
The detailed cause is currently under investigation, and the power plant remains in a stable condition.
This content was produced with the assistance of AI translation services.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.