Korea Hydro & Nuclear Power Kori Nuclear Power Headquarters (Director Lee Gwanghun) announced that at around 9:14 a.m. on the 10th, the turbine of Shin-Kori Unit 2 (pressurized water reactor type, 1 million kW class) was manually shut down due to a malfunction in the steam system equipment.



The detailed cause is currently under investigation, and the power plant remains in a stable condition.

Shin-Gori Unit 2 (left).

Shin-Gori Unit 2 (left).

View original image



This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing