Hanshin Engineering & Construction announced on the 13th that it conducted an on-site safety inspection on the 10th in preparation for heavy rain and the monsoon season.


The safety inspection held at the Seoul Subway Line 9 Phase 4 Section 3 site was attended by Hanshin Engineering & Construction CEO Jeon Jae-sik, Chief Safety Officer (CSO) Kim Kyung-soo, site managers and staff, as well as key partners from cooperating companies. They checked ▲vulnerable areas against heavy rain ▲risks of falls, toppling, and collapse within the site ▲the establishment of flood control plans and the status of flood control equipment and materials.

Hanshin Gongyeong conducted a safety inspection on the 10th at the construction site of Section 3, Phase 4 of Seoul Subway Line 9. Photo by Hanshin Gongyeong

Hanshin Gongyeong conducted a safety inspection on the 10th at the construction site of Section 3, Phase 4 of Seoul Subway Line 9. Photo by Hanshin Gongyeong

View original image

Through this internal safety inspection, Hanshin Engineering & Construction plans to improve identified risk factors and select and manage vulnerable areas where slope erosion, flooding damage, and river overflow may occur due to heavy rain, striving to create a safe construction site.



A representative from Hanshin Engineering & Construction stated, “We conducted the safety inspection as a proactive response, judging that recent collapse accidents at industrial sites are influenced by inflow of rainwater caused by heavy rain. Since weather anomalies have made forecasting difficult, we will strive to achieve 'Zero Serious Accidents' for the fourth consecutive year through swift action.”


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing