KHNP Hanul Unit 6, Power Generation Resumes
Normal Operation Output Around 9 AM on the 17th
KHNP Hanul Nuclear Power Headquarters (Director Lee Seyong) announced that "Hanul Unit 6 (Pressurized Water Reactor, 1,000 MW class), which was shut down on April 1 due to low steam generator water level, resumed power generation on the 16th and reached normal operating output around 9 a.m. on the 17th."
The cause of the reactor shutdown was confirmed to be damage to the signal line controlling the rotational speed of the main feedwater pump, which resulted in a decreased flow supplied to the steam generator.
Hot Picks Today
"Stock Set to Double: This Company Smiles Every...
- "Continuous Groundwater Extraction Causes Mexico City of 22 Million to Sink by 2...
- "Is Yours Just Gathering Dust at Home? Millennials & Gen Z Rediscover Digicams O...
- "Going to Seongsu-dong?" Japanese Girl Group Faces Taxi Refusal in Seoul
- "Prime Minister in Underwear?"... Italy's Meloni Posts Herself to Warn of Deepfa...
The Hanul Nuclear Power Headquarters has completed maintenance of the affected signal line and plans to implement follow-up measures to prevent recurrence, including multiplex design for main feedwater pump speed control.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.