Delay in Overhead Line and Partial Train Delivery on Line 5 Godeok Depot Ground Section
Seoul Metro (President Baek Ho) announced that due to snowfall overnight, snow accumulated and froze on the overhead catenary wires in the aboveground section of the 5 Line at Godeok Depot, causing disruptions in the power supply to the catenary wires and trains, resulting in some delays in train departures.
The delay in 5 Line departures occurred from the first train around 5:30 AM. The issue has now been resolved, and normal departures are underway.
The 2 Line also experienced delays of about 20 to 25 minutes on both inner and outer tracks due to snow accumulation on the overhead catenary wires in some aboveground sections and a turnout mismatch malfunction (occurred around 8:34 AM, resolved around 8:49 AM). The 7 Line experienced cumulative delays of 10 minutes on the up line and 25 minutes on the down line due to a platform screen door malfunction.
Hot Picks Today
"Rather Than Endure a 1.5 Million KRW Stipend, I'd Rather Earn 500 Million in the U.S." Top Talent from SNU and KAIST Are Leaving [Scientists Are Disappearing] ①
- [Breaking] Park Sukeun, Central Labor Relations Commission Chair: "Some Gaps Narrowed Between Samsung Electronics Labor and Management"
- "If That's the Case, Why Not Just Buy Stocks?" ETFs in Name Only, Now 'Semiconductor-Heavy' and a Playground for Short-Term Traders
- "I Take Full Responsibility"... Chung Yongjin Issues Direct Apology for Starbucks 'May 18 Controversy' (Update)
- "No Cure Available, Spread Accelerates... Already 105 Dead, American Infected"
A company official stated, “We apologize to the citizens who experienced inconvenience during their morning commute due to the snow accumulated overnight,” and added, “We will do our best to restore normal operations as quickly as possible.”
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.