Ulsan City Operates Temporary Detour Road Due to Reconstruction of Cheonsang 1 and 2 Bridges
From December 12 to the First Half of Next Year, Installation Near Existing Bridges
Cheonsang Rotary Intersection to Operate as a 3-Way Signal Intersection
Ulsan City will operate a temporary detour road for the sections of Cheonsang 1-gyo and Cheonsang 2-gyo bridges, which will be reconstructed due to the 'Beomseo Highpass IC~Cheonsang Lower Ramp (Jung 1-89) Road Expansion Construction' from the 12th of this month until the first half of next year.
Cheonsang 1-gyo crosses Cheonsangcheon near the Cheonsang roundabout adjacent to Beomseo-eup Administrative Welfare Center, while Cheonsang 2-gyo is a bridge passing in front of the Beomseo Nonghyup Economic Office Agricultural Product Sorting Center.
The temporary detour road will be installed near the existing bridges to minimize inconvenience for vehicles and pedestrians. The Cheonsang roundabout will be operated as a three-way signal intersection during the construction period.
Ulsan City plans to minimize citizen inconvenience by installing traffic signs such as construction notice boards and speed limit signs, as well as road safety facilities during this period.
Hot Picks Today
"Rather Than Endure a 1.5 Million KRW Stipend, I'd Rather Earn 500 Million in the U.S." Top Talent from SNU and KAIST Are Leaving [Scientists Are Disappearing] ①
- "You Might Regret Not Buying Now"... Overseas Retail Investors Stirred by News of Record-Breaking Monster Stocks' IPOs
- "Not Jealous of Winning the Lottery"... Entire Village Stunned as 200 Million Won Jackpot of Wild Ginseng Cluster Discovered at Jirisan
- Shinsegae Vice President Visits May 18 Bereaved Families, Apology for 'Tank Day' Controversy Rejected: "Will Apologize Again After Full Investigation"
- "How Did an Employee Who Loved Samsung End Up Like This?"... Past Video of Samsung Electronics Union Chairman Resurfaces
An official from Ulsan City stated, “Once the Beomseo Highpass IC, being installed by Korea Expressway Corporation, and the access road expansion (total length 1.0 km, four lanes) being implemented by Ulsan City are completed, it is expected to reduce congestion on National Route 24 and greatly improve accessibility to the highway.”
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.