November 8-9 Nighttime Hours

Ulsan City will carry out the 'Deoksin Bridge Deck Pavement Construction' from 9 PM on the 8th to 6 AM on the 9th.


This construction involves repaving the deteriorated bridge deck of Deoksin Bridge (length 200m, 4 lanes two-way) in Deoksin-ri, Onsan-eup, Ulju-gun.


Although two-way vehicle traffic will be possible during the construction hours, partial lane closures of 1 to 2 lanes in the construction section are necessary, so it is recommended to detour via surrounding roads (Deoksin Bridge).


Ulsan City plans to reduce citizen inconvenience by guiding vehicle traffic through construction notice boards, flashing warning lights, flashing display boards, and signal personnel deployment.



An official from Ulsan City stated, "Through this construction, we expect to not only alleviate citizen inconvenience and prevent safety accidents but also enhance user satisfaction by providing a more pleasant road environment."

Ulsan City Hall.

Ulsan City Hall.

View original image


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing