Changwon Special City to Implement Traffic Control at 2nd Anmin Tunnel on the 18th
Seongju Overpass Fully Closed in Both Directions at Cheonseon-dong Due to Bridge Installation
Changwon Special City, Gyeongnam, will fully block and partially control the road in front of Sinwol Vehicle Inspection Station on National Road No. 25 on the 18th.
View original image[Asia Economy Yeongnam Reporting Headquarters, Reporter Song Jong-gu] Changwon Special City in Gyeongnam will fully close and partially control the road in front of Sinwol Vehicle Inspection Station on National Road No. 25 on the 18th to install the deck of Seongju Overpass for entering the 2nd Anmin Tunnel (towards Jinhae-gu) in Seongsan-gu.
The full road closure will be conducted for 10 minutes during lunchtime when traffic volume is low to avoid traffic congestion in the urban area, and partial control will be enforced on the day from 9:30 AM to 3:30 PM, restricting one lane in both directions.
The "Construction Project of National Road Alternative Bypass (2nd Anmin Tunnel) within Changwon City" is being implemented by the Busan Regional Land Management Office, with Changwon City handling compensation work. The project aims to alleviate habitual traffic congestion during commuting hours in the existing Anmin Tunnel and to facilitate smooth transportation of industrial cargo between the National Industrial Complex and Busan New Port.
Hot Picks Today
SpaceX Opens IPO Floodgates... Anthropic and OpenAI Push Valuations into the Trillions
- "Not Jealous of Winning the Lottery"... Entire Village Stunned as 200 Million Won Jackpot of Wild Ginseng Cluster Discovered at Jirisan
- "I'll Stop by Starbucks Tomorrow": People Power Chungbuk Committee and Geoje Mayoral Candidate Face Criticism for Alleged 5·18 Demeaning Remarks
- "From 119 Call to Hospital Transport"... Saving Sudden Cardiac Arrest Patients with AI and Video Calls
- "How Did an Employee Who Loved Samsung End Up Like This?"... Past Video of Samsung Electronics Union Chairman Resurfaces
Lee Sang-in, Director of the Construction Road Division, stated, "Vehicle control is unavoidable for the assembly and installation of the girder for entering the 2nd Anmin Tunnel. We ask for the understanding and cooperation of citizens using the road, and we will do our best to minimize inconvenience and prevent safety accidents."
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.