Resumption of Vehicle Traffic at Yeoui Sangryu IC and Yeoui Haryu IC on Seoul Olympic-daero
On the 30th, the Jamsugyo Bridge in Seoul is submerged in water and is completely closed. Photo by Mun Ho-nam munonam@
View original image[Asia Economy Reporter Lim Cheol-young] Seoul City announced that vehicle traffic on Olympic-daero Yeoui Upper IC and Yeoui Lower IC, which had been restricted due to the rise in the Han River water level caused by increased discharge from Paldang Dam, resumed from 5 a.m. on the 1st as the heavy rain in the Seoul metropolitan area subsided.
Earlier, as of midnight, the full section of Dongbu Expressway in both directions was reopened, and from 12:25 a.m., traffic became possible from Yangjaecheon-ro to Yeongdong 1-gyo section.
Hot Picks Today
"Rather Than Endure a 1.5 Million KRW Stipend, I'd Rather Earn 500 Million in the U.S." Top Talent from SNU and KAIST Are Leaving [Scientists Are Disappearing] ①
- Experts Shocked by Record Numbers: "Just the Tip of the Iceberg" — The Identity Behind the 90% Dominating Teens [Chuiyakgukga]⑨
- "If That's the Case, Why Not Just Buy Stocks?" ETFs in Name Only, Now 'Semiconductor-Heavy' and a Playground for Short-Term Traders
- "Bought for a Special Price, but Cheaper Today"... Online Malls Caught Inflating Discount Rates by Raising Regular Prices
- "No Cure Available, Spread Accelerates... Already 105 Dead, American Infected"
However, Jamsu Bridge remains closed to traffic as the water level still exceeds 7 meters.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.