Doosan Construction Selected as Contractor for Small-scale Reconstruction in Buk-gu, Gwangju View original image


[Asia Economy Reporter Kim Min-young] Doosan Construction announced on the 5th that it was selected as the construction company by the union members at the small-scale reconstruction contractor selection meeting held on the 1st in the Yongbong-dong area of Buk-gu, Gwangju.


The small-scale reconstruction project in Yongbong-dong, Gwangju, covers a site area of 8,353.37㎡, a total floor area of 26,641.79㎡, and a floor area ratio of 245.8%. It is planned to be newly built with 3 apartment buildings of 233 households ranging from 2 basement floors to 29 above-ground floors, along with auxiliary welfare facilities. The construction cost is approximately 44.7 billion KRW.


The project site is located near Gwangju Station and the Donggwangju IC of the Honam Expressway, providing excellent transportation conditions. Additionally, Gwangju Metro Line 2 is scheduled to open in 2024.


Nearby the project site are Munhong Elementary School, Yongbong Middle School, and Chonnam National University Gwangju Campus, offering excellent educational conditions.



A Doosan Construction official stated, "We plan to cooperate with the union to obtain project implementation approval and management disposition approval in 2023, begin relocation, and aim to start construction by the end of 2023."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing