Seoul Subway Line 2 Service Resumes After 20-Minute Suspension Due to "Structural Abnormality" View original image

[Asia Economy Reporter Song Seung-yoon] At around 7:38 PM on the 28th, a sagging phenomenon occurred in the finishing material on the upper outer ceiling of Guro Digital Complex Station on Seoul Subway Line 2, causing train operations to be suspended for about 20 minutes.



Seoul Metro suspended train operations between Daerim Station and Bongcheon Station to carry out ceiling repair work and resumed operations around 7:57 PM.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing