Hanul Nuclear Power Plant Unit 2 Resumes Operation After Scheduled Maintenance... Reaches 100% Output
Hanul Nuclear Power Plant Unit 2. (Photo by Korea Hydro & Nuclear Power Hanul Nuclear Power Headquarters)
View original image[Asia Economy Yeongnam Reporting Headquarters, Reporter Jucheol In] Hanul Nuclear Power Plant Unit 2 (Pressurized Water Reactor type, 950 MW class) resumed power generation after completing its planned preventive maintenance and reached 100% output on the 10th.
Hanul Unit 2 entered planned preventive maintenance on October 14 of last year and restarted power generation on the 6th of this month.
Hot Picks Today
"Stocks Are Not Taxed, but Annual Crypto Gains Over 2.5 Million Won to Be Taxed Next Year... Investors Push Back"
- "Don't Throw Away Coffee Grounds" Transformed into 'High-Grade Fuel' in Just 90 Seconds [Reading Science]
- Government: "One Korean Vessel Passing Through Strait of Hormuz in Consultation with Iran"
- "Groups of 5 or More Now Restricted"... Unrelenting Running Craze Leaves Citizens and Police Exhausted
- "Even With a 90 Million Won Salary and Bonuses, It Doesn’t Feel Like Much"... A Latecomer Rookie Who Beat 70 to 1 Odds [Scientists Are Disappearing] ③
Korea Hydro & Nuclear Power Hanul Nuclear Power Headquarters conducted statutory inspections during the planned preventive maintenance period, including nuclear fuel replacement and containment liner plate inspection, and performed various checks and maintenance to enhance the reliability of the power generation facilities.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.