Yongin Public Bus Terminal Reconstruction 추진... Consulting Service 진행 Until April View original image


[Asia Economy (Yongin) = Reporter Lee Young-gyu] The Yongin Public Bus Terminal in Gyeonggi Province will be reconstructed.


Yongin City announced on the 4th that it will carry out a project to establish a basic plan for the reconstruction of the aging Yongin Public Bus Terminal by the end of April.


The city previously selected Isu Comprehensive Architectural Office last month as the firm to establish the basic plan.


The city plans to demolish the existing terminal building, which is a one-story structure with a total floor area of 1,979.25㎡ on a 12,302㎡ site at 23-1, Gimnyangjang-dong, Cheoin-gu, and build a new two-story terminal with a total floor area of 3,300㎡.


Through this project, the city will calculate the required facility area, develop a traffic management plan and an appropriate architectural space plan reflecting it, and determine the proper scale of the terminal. Additionally, it will review and analyze traffic issues arising from the terminal reconstruction and prepare an optimal entry and exit plan based on this analysis.


Once the basic plan is established, the city will hold a design competition starting in May, complete detailed design and contractor selection from October this year to August next year, and begin construction in September next year.



Baek Gun-gi, mayor of Yongin City, stated, "We will proceed steadily with the reconstruction of the aging Yongin Public Bus Terminal to enhance citizens' mobility convenience and establish a public transportation service system befitting the status of a metropolitan city with a population of one million."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing