Gwangju City Completes Section 1 of City Road No. 5 Sidewalk Project... Establishes Pedestrian-Centered Road
Gwangju City in Gyeonggi Province announced on September 5 that the sidewalk installation project (Section 1) on City Road No. 5 in the Gwaneum-ri area of Toechon-myeon was recently completed, allowing citizens to use the walkway safely and conveniently from early September.
Bing Sehwan, mayor of Gwangju City, is inspecting the site of the Sidewalk Installation Project (Section 1) on City Road No. 5 in the Gwaneum-ri area of Toechon-myeon. Provided by Gyeonggi Gwangju City
View original imageThis project involved installing sidewalks along a 1.3-kilometer section (from Gwaneum 2 Bridge to Gwaneum 5 Bridge) of City Road No. 5, which has a total length of 4.8 kilometers. Previously, the absence of sidewalks forced pedestrians to share the road with vehicles, causing inconvenience. With this project, a pedestrian-friendly and pleasant road environment has been established.
In particular, City Road No. 5 serves as a route connecting major tourist attractions. The installation of sidewalks has improved accessibility for tourists and created a more walkable environment. As a result, positive effects such as revitalization of local tourism and commercial districts are expected.
Hot Picks Today
"Stocks Are Not Taxed, but Annual Crypto Gains Over 2.5 Million Won to Be Taxed Next Year... Investors Push Back"
- "Not Jealous of Winning the Lottery"... Entire Village Stunned as 200 Million Won Jackpot of Wild Ginseng Cluster Discovered at Jirisan
- "Jeong Yu-kyung Is a Neighbor"...Itaewon Standalone House with Record 23.2 Billion Won Appraisal Up for Auction [Real Estate AtoZ]
- "How Did an Employee Who Loved Samsung End Up Like This?"... Past Video of Samsung Electronics Union Chairman Resurfaces
- "Even With a 90 Million Won Salary and Bonuses, It Doesn’t Feel Like Much"... A Latecomer Rookie Who Beat 70 to 1 Odds [Scientists Are Disappearing] ③
Mayor Bang Sehwan stated, "This sidewalk installation project goes beyond simple infrastructure improvement, achieving both the enhancement of walking culture and the expansion of tourism infrastructure." He added, "We will continue to work closely with relevant departments and residents to accelerate the completion of the entire sidewalk section."
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.