Dongducheon City Completes Renovation Project of Food Stall Village Next to Sincheon Seonyeopgyo Bridge
Creating a Pleasant River Environment through Demolition of Old Pojangmacha Village and Bank Maintenance
Improving Road Conditions by Adjusting Road Width and Securing Right-Turn Lane
Dongducheon City completed the improvement project of the street food stall village next to Seoneopgyo Bridge on Sincheon on the 28th, aimed at improving flood control and environmental conditions of Sincheon and creating a pleasant river environment.
Dongducheon City, Gyeonggi Province (Mayor Park Hyung-deok) announced on the 29th that it has completed the renovation project of the street food stall village next to Suneopgyo Bridge on Sincheon Stream, which was promoted to improve flood control and create a pleasant river environment on the 28th.
The Sincheon street food stall village is located on the left bank upstream of Suneopgyo Bridge on Sincheon Stream, along the north-south riverside road section connecting Dongducheon City and Yangju City.
Additionally, this area is connected to National Route 3 at Eunhyeon IC, resulting in considerable traffic volume.
The street food stall village, which has been operating since 1989, had become an eyesore not only to citizens but also to visitors to Dongducheon due to aging facilities and an unclean surrounding environment.
Accordingly, Dongducheon City officially began the renovation project of the street food stall village, which had legal issues under current regulations, starting in 2021. After long-term consultations with the residents of the street food stall village, the city decided to support relocation and removal costs, and subsequently proceeded with the demolition of the stalls and embankment maintenance work.
The construction, which began in December 2023 with a total project cost of 1.1 billion KRW, involved demolishing 12 existing street food stall buildings, maintaining the embankment, and adding one right-turn lane to the existing two-lane road. The maintenance of the existing bicycle path on the floodplain was also completed.
Hot Picks Today
If They Fail Next Year, Bonus Drops to 97 Million Won... A Closer Look at Samsung Electronics DS Division’s 600M vs 460M vs 160M Performance Bonuses
- Opening a Bank Account in Korea Is Too Difficult..."Over 150,000 Won in Notarization Fees Just for a Child's Account and Debit Card" [Foreigner K-Finance Status]②
- President Lee Praises Bloomberg's Correction on 'National Dividend' as "Admirable Integrity in Journalism" (Comprehensive)
- Room Prices Soar from 60,000 to 760,000 Won and Sudden Cancellations: "We Won't Even Buy Water in Busan" — BTS Fans Outraged
- "Who Is Visiting Japan These Days?" The Once-Crowded Tourist Spots Empty Out... What's Happening?
A Dongducheon City official stated, “With the demolition of the street food stall village and the completion of embankment maintenance, a pleasant river and road environment will be created, which is expected to increase citizen satisfaction.” He added, “We will continue to maintain river infrastructure to improve the quality of life for local residents.”
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.