Gwangju Gwangsan-gu, Rapid Promotion of Usan District Stormwater Retention Facility
Gwangsan-gu, Gwangju Metropolitan City, is resuming the 'Usan District Stormwater Retention Facility Project.'
The installation work for the stormwater retention facility was originally scheduled for completion last year but was halted due to design defects such as insufficient crane space for installing retention tank materials. A total of 14.5 billion KRW will be invested.
The district diagnosed the causes of issues that arose during the construction phase and, after consultations with related agencies, prepared reinforcement measures considering structural stability and ease of construction.
Next month, through a review by the Technical Advisory Committee, the district plans to quickly complete the technical verification of the reinforcement measures and finalize design changes and other improvements.
Hot Picks Today
"Samsung and Hynix Were Once for the Underachievers"... Hyundai Motor Employee's Lament
- "Sold Everything Fearing Bankruptcy, Then It Soared 3,900 Times: How a Stock Once Feared for Delisting Became an AI Powerhouse"
- Court Partially Grants Samsung Electronics' Injunction to Prohibit Industrial Action... 100 Million Won Penalty Per Day for Violations
- President Lee: "Corporate Management Rights Should Be Respected as Much as Labor Rights"...Final Samsung Labor-Management Negotiations (Comprehensive)
- "That? It's Already Stashed" Nightlife Scene Crosses the Line [ChwiYak Nation] ③
An official from the district stated, "We will firmly and swiftly resume the project to dispel concerns about delays in the stormwater retention facility construction and to resolve the frequent flooding damage in the Usan-dong area."
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.