Gwangjin-gu Holds Resident Briefing Session on the 21st to Promote the Vertical Expansion of the Shared Parking Lot in the 72-122 Area of Junggok-dong

Plan to Change the Existing 53-Space Flat Parking Lot into a Two-Level, 92-Space Above-Ground Parking Structure on the First Floor

Improving Traffic Convenience on Ginkgo-rang-gil Passageway to Enhance Resident Safety... Time Allocated for Resident Feedback and Q&A



Gwangjin-gu, Construction of Multi-level Joint Parking Lot in Gilgoranggil Residential Area View original image

Gwangjin-gu (Mayor Kim Kyung-ho) held a resident briefing session on the 21st at the Junggok 4-dong Community Center auditorium to promote the vertical expansion of the shared parking lot in the 72-122 area of Junggok-dong.


The 72 area of Junggok-dong is densely populated with multi-family houses and villas, causing chronic parking difficulties.


Currently, the site has a flat parking lot with 53 spaces. The district plans to convert this into a two-level above-ground parking structure on the first floor, securing an additional 39 spaces for a total of 92 shared parking spaces.


Once the parking lot construction is completed in July 2025, traffic inconvenience on the narrow Ginkgo-rang-gil passageway caused by illegal parking will be resolved, and blind spots will be reduced, enhancing the safety and convenience of residents.


During the briefing session, various resident opinions were presented, including alternative parking during construction and resolving inconveniences caused by the building process.


Mayor Kim Kyung-ho stated, “We are promoting the parking lot expansion project to resolve the parking difficulties in the Junggok-dong area. We will collect and reflect residents’ opinions to minimize inconvenience and repay them with good facilities.”



Gwangjin-gu is also implementing measures to solve parking issues in the Junggok-dong area, including ▲creating a public parking lot with 94 spaces at Baenamuteo Park in Junggok 3-dong ▲creating a public parking lot with 288 spaces on the site of the pediatric and adolescent clinic ▲operating a temporary parking lot with 186 spaces on the KEPCO site ▲and carrying out fence demolition projects.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing