Shin-Kori Unit 4 Reaches 100% Output After Planned Preventive Maintenance Completion
[Asia Economy Yeongnam Reporting Headquarters, Reporter Hwang Du-yeol] The Shin-Kori Unit 4 reactor (pressurized water reactor type, 1.4 million kW class) of Korea Hydro & Nuclear Power's Saewool Nuclear Power Headquarters resumed power generation on the 14th after completing its second planned preventive maintenance and reached 100% output at 12 a.m. on the 18th.
Hot Picks Today
"Rather Than Endure a 1.5 Million KRW Stipend, I'd Rather Earn 500 Million in the U.S." Top Talent from SNU and KAIST Are Leaving [Scientists Are Disappearing] ①
- "Not Jealous of Winning the Lottery"... Entire Village Stunned as 200 Million Won Jackpot of Wild Ginseng Cluster Discovered at Jirisan
- Controversy Over Mysterious Numbers at Starbucks: From Sewol Ferry and Park Geun-hye to May 18
- Democratic Party Pledges 'Gangho Axis Railroad Network': "Gangneung to Mokpo in 4 Hours"
- "How Did an Employee Who Loved Samsung End Up Like This?"... Past Video of Samsung Electronics Union Chairman Resurfaces
During the planned preventive maintenance period, Shin-Kori Unit 4 underwent statutory inspections according to the Nuclear Safety Act, fuel replacement, and inspection and maintenance of major equipment and facilities.
This content was produced with the assistance of AI translation services.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.