[Asia Economy Reporter Park Jihwan] Gwangmyeong Electric announced on the 15th that it has signed a contract worth 7.9 billion KRW with the Korea Rail Network Authority for the manufacturing and installation of a 29KV electric railway switchgear at one location outside the Yongsan Substation on the Gyeongwon Line.



The contract period is from the previous day until December 31, 2022.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing