People Party Submits Petition to the National Assembly for Original GTX-D Gimpo-Hanam Route Lawmaker Introduction
[Asia Economy Reporter Naju-seok] Members of the People’s Party have submitted a petition to the National Assembly in the form of a member introduction, demanding the inclusion of the GTX-D Gimpo-Hanam direct line and the extension plan of Line 5 (Gimpo Hangang Line) in the 4th National Railroad Network Construction Plan.
On the 26th, People’s Party lawmaker Lee Tae-gyu, floor leader Kwon Eun-hee, and lawmaker Choi Yeon-sook submitted the petition from the Gimpo Geomdan Transportation Citizens’ Coalition to the National Assembly Secretariat through the petition introduction, stating, "We must listen to the suffering of citizens in the second phase new towns of Gimpo and Geomdan, which lack transportation measures."
They pointed out, "More than 80% of residents commute to Seoul, but not only Olympic-daero but also the two-car Gimpo Gold Line, with a congestion rate of 285%, is truly a hellish train," adding, "With plans for a population of 760,000 in Gimpo and 330,000 in Geomdan New Town by 2035, if transportation issues are not resolved quickly, the situation will worsen."
Hot Picks Today
If They Fail Next Year, Bonus Drops to 97 Million Won... A Closer Look at Samsung Electronics DS Division’s 600M vs 460M vs 160M Performance Bonuses
- RIA Accounts Surpass 240,000 Subscriptions... Sold Nvidia, Bought Samsung Electronics
- Room Prices Soar from 60,000 to 760,000 Won and Sudden Cancellations: "We Won't Even Buy Water in Busan" — BTS Fans Outraged
- "Manhole Cover Blasts Open in 12 Seconds... The Reason Behind the 'Gangnam Flood Disaster' [Report]"
- "Who Is Visiting Japan These Days?" The Once-Crowded Tourist Spots Empty Out... What's Happening?
Members of the People’s Party stated, "Only the original GTX-D line plan (Gimpo to Hanam) and the extension of Line 5 (Gimpo Hangang Line) will contribute to balanced development in the metropolitan area," and emphasized, "We strongly agree with the petition that the original GTX-D line plan (Gimpo to Hanam) and the extension of Line 5 (Gimpo Hangang Line) must be included in the 4th National Railroad Network Construction Plan to be finalized at the end of June."
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.