Chuncheon Soyang 2 Bridge, Spectacular Transformation with 'Two-Way Media Facade'... Completion on the 27th
Pilot Operation of Content from June to August After Completion
[Asia Economy Reporter La Youngcheol] Chuncheon City announced on the 24th that the "Media Facade Construction Project for the Nightscape Tourism Resource of Uiamho Lake," which was promoted with a project cost of 990 million KRW, will be completed on the 27th.
Additionally, maintenance of the media facade on the opposite side towards Soyanggang Skywalk, installed in 2017, will also be carried out by the end of this month.
As a result, the media facade on Soyang 2 Bridge is installed on the two-way arch structures, allowing enjoyment from both the existing Soyanggang Skywalk direction and the Gubongsan direction.
The city expects that, when linked with the existing landscape lighting of Soyang 2 Bridge, it will become a representative nightscape attraction of Chuncheon.
Hot Picks Today
If They Fail Next Year, Bonus Drops to 97 Million Won... A Closer Look at Samsung Electronics DS Division’s 600M vs 460M vs 160M Performance Bonuses
- Opening a Bank Account in Korea Is Too Difficult..."Over 150,000 Won in Notarization Fees Just for a Child's Account and Debit Card" [Foreigner K-Finance Status]②
- President Lee Praises Bloomberg's Correction on 'National Dividend' as "Admirable Integrity in Journalism" (Comprehensive)
- Room Prices Soar from 60,000 to 760,000 Won and Sudden Cancellations: "We Won't Even Buy Water in Busan" — BTS Fans Outraged
- "Who Is Visiting Japan These Days?" The Once-Crowded Tourist Spots Empty Out... What's Happening?
The Soyang 2 Bridge media facade will be completed on the 27th and is scheduled to begin pilot operation of content from June to August.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.