The site of the fire at the cold-rolled steel sheet manufacturing factory in Sinchon-dong, Changwon City, which occurred on the afternoon of the 18th.

The site of the fire at the cold-rolled steel sheet manufacturing factory in Sinchon-dong, Changwon City, which occurred on the afternoon of the 18th.

View original image

[Asia Economy Yeongnam Reporting Headquarters Reporter Park Saeyan] At around 4 p.m. on the 18th, a fire broke out on the first floor of a stainless steel cold-rolled steel sheet manufacturing factory located in Sinchon-dong, Changwon-si, Gyeongnam.


The fire burned part of the cutting oil filtration dust collector and 10㎡ of the factory's exterior wall, causing property damage estimated at 5 million won (according to the fire department), and was completely extinguished within 40 minutes.


The factory was in operation at the time of the fire, but all employees inside evacuated on their own.



The police and fire authorities believe the fire started in the cutting oil filtration duct and spread to the factory exterior wall, and are investigating the exact cause of the fire.

The site of the fire at the cold-rolled steel sheet manufacturing factory in Sinchon-dong, Changwon City, which occurred on the afternoon of the 18th.

The site of the fire at the cold-rolled steel sheet manufacturing factory in Sinchon-dong, Changwon City, which occurred on the afternoon of the 18th.

View original image


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing