The previously closed Jamsu Bridge. / Photo by Mun Ho-nam munonam@

The previously closed Jamsu Bridge. / Photo by Mun Ho-nam munonam@

View original image


[Asia Economy Reporter Lee Gwan-ju] Vehicle traffic on Jamsu Bridge, which was submerged due to heavy rain, resumed after 11 days.


According to Seoul City and the police, vehicle restrictions on Jamsu Bridge were lifted from 7:25 PM on the 13th. This was due to the water level around Jamsu Bridge dropping below the vehicle restriction threshold (6.2m). As of 9:30 PM that day, the water level at Jamsu Bridge was recorded at 5.54m.


Pedestrian traffic on Jamsu Bridge is restricted when the water level is above 5.5m, and vehicle traffic is restricted when it exceeds 6.2m. The bridge becomes submerged when the water level exceeds 6.5m.



Traffic on Jamsu Bridge had been restricted for more than ten days since the restriction began on the 2nd of this month.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing