◆Yushin= Signed a contract with the Nepali Army for the design and supervision project of the Kathmandu-Terai section Fast Track highway worth 16.3 billion KRW.
◆Hanchang Industry= Decided to transfer land and buildings worth 7.2 billion KRW to Korea Gas Corporation.
Hot Picks Today
"If It's Uncomfortable, They Cut Ties": Three O...
◆Top Engineering= Acquired patents for substrate cutting devices, paste dispensers, conductive material coating devices, and substrate processing devices.
This content was produced with the assistance of AI translation services.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.