Korea Rail Network Authority Director Lee Sunghae Inspects GTX-A Guseong Station Site
The Korea Rail Network Authority announced that Director Lee Sunghae visited the construction site of Exit 5 on the west side of GTX-A Guseong Station on the 27th to inspect the final preparations before the start of service.
Lee Sunghae, Director of the Korea Rail Network Authority, visited the construction site of Exit 5 on the west side of GTX-A Guseong Station on the 27th to inspect the final preparations before the start of service. Photo by Korea Rail Network Authority
View original imageUntil now, only Exits 1 to 3 of the Suin-Bundang Line and Exit 4 of GTX-A have been in operation at Guseong Station. As a result, passengers from the western area have experienced inconvenience due to the difficulty of accessing the station.
The construction of Exit 5 was carried out to improve station access for the western area. This exit is scheduled to open on June 30.
Hot Picks Today
"Could I Also Receive 370 Billion Won?"... No Limit on 'Stock Manipulation Whistleblower Rewards' Starting the 26th
- Samsung Electronics Labor-Management Reach Agreement, General Strike Postponed... "Deficit-Business Unit Allocation Deferred for One Year"
- "From a 70 Million Won Loss to a 350 Million Won Profit with Samsung and SK hynix"... 'Stock Jackpot' Grandfather Gains Attention
- "Stocks Are Not Taxed, but Annual Crypto Gains Over 2.5 Million Won to Be Taxed Next Year... Investors Push Back"
- "Who Is Visiting Japan These Days?" The Once-Crowded Tourist Spots Empty Out... What's Happening?
On this day, Director Lee urged those at the site to "make every effort until the very end to enhance station accessibility and pedestrian convenience for local residents."
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.