Increase in Radiation Monitor Readings Inside Reactor Building

Korea Hydro & Nuclear Power Hanul Nuclear Power Headquarters (Director Lee Seyong) announced on the 12th, "At Shin Hanul Unit 2 (pressurized water reactor, 1.4 million kW class), the radiation monitor reading inside the reactor building increased, and in accordance with procedures, we reported this to the local office of the Nuclear Safety and Security Commission."


According to the on-site inspection at Shin Hanul Unit 2, a leak occurred at equipment near the reactor coolant pump, and to inspect the leak point, output reduction began at around 10:30 a.m., and the plant was shut down at 12:35 p.m.



This incident has had no radiological impact on the external environment, and Hanul Nuclear Power Headquarters plans to thoroughly inspect and repair the leak site.

Shinhanul Unit 2.

Shinhanul Unit 2.

View original image



This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing