Dongdaemun-gu, Rapid Snow Removal Minimizes Resident Inconvenience
Minimizing Resident Inconvenience with Rapid Snow Removal
Dongdaemun-gu Staff Working Through the Dawn... 292 Personnel, 237 Equipment Units, 153 Tons of Materials Deployed
Dongdaemun-gu, Seoul (Mayor Lee Pil-hyung) began snow removal operations immediately after confirming snow accumulation on vulnerable sections and side streets around 2 a.m. on the 27th, and conducted snow removal across all areas starting from 3 a.m.
To ensure residents' safe commute, snow removal was carried out everywhere residents frequent, from bus stops and main roads to side streets and alleys.
The district actively utilized snow removal equipment such as sidewalk snow blowers for swift and efficient snow clearing. Additionally, since last year, the number of dedicated snow removal personnel has been significantly increased to reduce the workload on employees.
On the day, Mayor Lee Pil-hyung of Dongdaemun-gu also visited the snow removal site, clearing snow piled on side streets and sidewalks alongside the staff to encourage them.
Hot Picks Today
"How Much Will They Get?" 600 Million vs. 460 Million vs. 160 Million... Samsung Electronics DS Division's 'Three Wallets Under One Roof'
- Opening a Bank Account in Korea Is Too Difficult..."Over 150,000 Won in Notarization Fees Just for a Child's Account and Debit Card" [Foreigner K-Finance Status]②
- "More Than Half Received A's"... Harvard to Tackle 'Grade Inflation'
- Room Prices Soar from 60,000 to 760,000 Won and Sudden Cancellations: "We Won't Even Buy Water in Busan" — BTS Fans Outraged
- "Who Is Visiting Japan These Days?" The Once-Crowded Tourist Spots Empty Out... What's Happening?
A total of 292 personnel, 237 pieces of equipment, and 153 tons of materials were deployed for the snow removal operation, with a snowfall amount of 11.5 cm observed at 6 a.m.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.