Korea Hydro & Nuclear Power.

Korea Hydro & Nuclear Power.

View original image

[Asia Economy Yeongnam Reporting Headquarters Reporter Dongguk Lee] Korea Hydro & Nuclear Power's Gori Nuclear Power Headquarters announced that Gori Unit 2, which completed its 31st planned preventive maintenance, resumed power generation at 5:19 AM on the 30th of last month and reached 100% reactor output at 12:50 AM on the 1st.


During this planned preventive maintenance period, the Gori Nuclear Power Headquarters conducted statutory inspections in accordance with the Nuclear Safety Act and the Electric Utility Act, and performed inspections and maintenance on major equipment and facilities.



In particular, work was carried out to upgrade the overhead line section to Gas-Insulated Bus (GIB) in preparation for typhoon intrusion, and the safety of the power plant was confirmed through integrity checks of the reactor lower part and maintenance of major facilities.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Today’s Briefing